42-095-32127

Final Completion

RABON A

CONCHO County · District 7 · JASPER ENERGY INCORPORATED · ARENA (KING SAND)

Permits

1

Max Depth

2,300 ft

First Permit

2005-08-26

Latest Activity

2005-08-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

2013-03-12

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2006-12

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 2,184 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
ARENA (KING SAND)2,162 ft+22 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
2,164–2,168 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"364 ft185 sx
4.5"2,253 ft250 sx

Permit History (1)

Applications (1)

#605516 A JASPER ENERGY, INCORPORATED
received 2005-08-26

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2006-10-11 log on file
W-2/G-1 2007-06-26

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CONCHO County.

Well Details

Well Number
1
Max Depth
2,300 ft
Drill Type
Vertical
County
CONCHO
District
7

Operator

Location
DECATUR
P-5 Status
Inactive (filed 2018-05-09)
Cum Oil (all leases)
137,414 bbl
Cum Gas (all leases)
— mcf
Total Permits
20