42-097-03018

BORDOVSKY UNIT

COOKE County · District 9 · DEL RIO PRODUCTION CO.

Permits

1

Max Depth

4,000 ft

First Permit

2016-10-26

Latest Activity

2016-10-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Casing (2)

SizeSet DepthCement
10.75"55 ft
7"2,269 ft

Permit History (1)

Applications (1)

#819445 A DEL RIO PRODUCTION CO.
received 2016-10-14

Records & Logs

2 completion filings on record.

W-2/G-1 1958-07-10
W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in COOKE County.

Well Details

Well Number
105
Max Depth
4,000 ft
Drill Type
Vertical
County
COOKE
District
9

Operator

Location
GAINESVILLE
P-5 Status
Inactive (filed 2019-04-24)
Cum Oil (all leases)
18,851 bbl
Cum Gas (all leases)
— mcf
Total Permits
13