42-097-31713

Final Completion

DILLARD JOE

COOKE County · District 9 · HARPER WAYNE · SIVELLS BEND

RRC Lookup

Permits

1

Max Depth

8,600 ft

First Permit

1981-01-26

Latest Activity

1981-01-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-03-15

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: HARPER WAYNE ≠ Production: SNR OPERATING, LLC (reported 2025-10)

Resolved via: schedulingHARPER WAYNE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#106223 A HARPER, WAYNE
received 1981-01-26

Well Details

Well Number
3
Max Depth
8,600 ft
Drill Type
Vertical
County
COOKE
District
9
Operator
HARPER WAYNE
Completed
1981-03-15

Operator

Location
DALLAS
P-5 Status
Y (filed 2014-12-05)
Cum Oil (all leases)
1,700,635 bbl
Cum Gas (all leases)
1,325,511 mcf
Total Permits
171

External Links

Live © 2026 Petrora