42-097-33620

Final Completion

JOHNSON W. A.

COOKE County · District 9 · FELDERHOFF PRODUCTION COMPANY · COOKE COUNTY REGULAR

Permits

1

Max Depth

1,999 ft

First Permit

2003-03-19

Latest Activity

2003-03-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-09-26

Shut-In

Plugged

2024-01-23

!

EWA / Permit operator mismatch

Scheduling: FELDERHOFF PRODUCTION COMPANY ≠ Permit: FIDELITY ENERGY CO.

Resolved via: productionFELDERHOFF PRODUCTION COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Injection / Disposal

H-1 Injection Plugged 2024-01-31 UIC #000095141 permitted 2005-04-06

Permitted Volume

75 bbl/d

Max Pressure

700 psi

Injection Interval

1,466–1,468 ft

Injected (12mo)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 742 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
BASE CARATEOUS1,226 ft-484 ft
TOP STRAWN (Strawn)1,450 ft-708 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
1,466–1,468 ftPerforated

Casing (1)

SizeSet DepthCement
5.5"1,539 ft300 sx

Permit History (1)

Applications (1)

#529778 A FIDELITY ENERGY CO.
received 2003-03-19

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2003-10-24 log on file
W-2/G-1 2003-12-23

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in COOKE County.

Well Details

Well Number
06
Max Depth
1,999 ft
Drill Type
Vertical
County
COOKE
District
9
Completed
2003-09-26

Operator

Location
MUENSTER
P-5 Status
Active (filed 2026-03-31)
Cum Oil (all leases)
4,212,453 bbl
Cum Gas (all leases)
9,097,944 mcf
Activities
OPRS/G, OPRS/O
Total Permits
462