42-103-05178

Final Completion

STATE OF TEXAS -G-

CRANE County · District 8 · HAYLAN OIL COMPANY · DUNE (WOLFCAMP)

RRC Lookup

Permits

1

Max Depth

3,580 ft

First Permit

1980-01-03

Latest Activity

1980-01-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1959-11-21

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: HAYLAN OIL COMPANY ≠ Production: CARDWELL OIL CORPORATION (reported 2020-05)

!

EWA / Permit operator mismatch

Scheduling: HAYLAN OIL COMPANY ≠ Permit: TEXACO INC.

Resolved via: schedulingHAYLAN OIL COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#68369 A TEXACO INC.
received 1980-01-03

Well Details

Well Number
9
Max Depth
3,580 ft
Drill Type
Vertical
County
CRANE
District
8
Completed
1959-11-21

Operator

Location
MIDLAND
P-5 Status
Y (filed 2000-03-03)
Cum Oil (all leases)
58,788 bbl
Cum Gas (all leases)
284,297 mcf
Total Permits
33

External Links

Live © 2026 Petrora