42-103-33320

Final Completion

UNIVERSITY -25-

CRANE County · District 8 · MOBIL PRODUCING TX. & N.M. INC. · MCELROY (DEVONIAN UPPER)

RRC Lookup

Permits

4

Max Depth

12,400 ft

First Permit

1983-11-21

Latest Activity

2011-11-14

Lifespan

28 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-02-06

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: MOBIL PRODUCING TX. & N.M. INC. ≠ Production: R3 OPERATING CORPORATION (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: MOBIL PRODUCING TX. & N.M. INC. ≠ Permit: CHAPARRAL ENERGY, L.L.C.

Resolved via: productionR3 OPERATING CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (5)

#727524 A CHAPARRAL ENERGY, L.L.C.
received 2012-05-30
#727524 A CHAPARRAL ENERGY, L.L.C.
received 2011-11-02
#270035 A SUPERIOR OIL COMPANY, THE
received 1985-03-18
#221122 A SUPERIOR OIL COMPANY, THE
received 1984-04-06
#221122 A SUPERIOR OIL COMPANY, THE
received 1983-11-14

Well Details

Well Number
3
Max Depth
12,400 ft
Drill Type
Vertical
County
CRANE
District
8
Completed
1985-02-06

Operator

Location
SPRING
P-5 Status
Y (filed 2025-05-02)
Cum Oil (all leases)
181,898,111 bbl
Cum Gas (all leases)
1,950,074,148 mcf
Activities
CSGD/G, GTHS/C, GTHS/G, OPRS/G
Total Permits
6,763

External Links

Live © 2026 Petrora