Permits
1
Max Depth
1,650 ft
First Permit
1988-10-13
Latest Activity
1988-10-13
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1948-05-23
Shut-In
—
Plugged
2014-12-10
EWA / Production operator mismatch
Scheduling: PENERGY ≠ Production: SETEX OIL AND GAS COMPANY (reported 2001-11)
EWA / Permit operator mismatch
Scheduling: PENERGY ≠ Permit: WINTERSHALL CORPORATION
Resolved via: scheduling → PENERGY
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 2,632 ft (DF)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| GRAYBURG | 1,233 ft | +1,399 ft |
| MCELROY | 1,291 ft | +1,341 ft |
| SAN ANDRES | 1,318 ft | +1,314 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 1,260–1,268 ft | Perforated |
| 1,404–1,500 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 785 ft | 100 sx |
| 7" | 1,231 ft | — |
| 7" | 1,380 ft | — |
| 5.5" | 1,438 ft | 300 sx |
| 4.5" | 1,654 ft | 240 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet