42-105-33956

Final Completion

UNIVERSITY 33-14 E

CROCKETT County · District 7 · THOMPSON J. CLEO · PERNER RANCH (ELLEN)

RRC Lookup

Permits

2

Max Depth

10,000 ft

First Permit

1982-02-18

Latest Activity

1988-08-08

Lifespan

6 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-05-08

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: THOMPSON J. CLEO ≠ Production: RED STAG OPERATING, LLC (reported 2025-12)

Resolved via: productionRED STAG OPERATING, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#349744 A THOMPSON, J. CLEO
received 1988-08-04
#153657 A GULF OIL CORP.
received 1982-02-18

Well Details

Well Number
1
Max Depth
10,000 ft
Drill Type
Vertical
County
CROCKETT
District
7
Completed
1982-05-08

Operator

Location
DALLAS
P-5 Status
Y (filed 2023-11-03)
Cum Oil (all leases)
34,884,610 bbl
Cum Gas (all leases)
184,572,150 mcf
Total Permits
1,739

External Links

Live © 2026 Petrora