Permits
1
Max Depth
1,700 ft
First Permit
1987-05-20
Latest Activity
1987-05-20
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-07-10
Shut-In
—
Plugged
2014-09-16
EWA / Production operator mismatch
Scheduling: PENERGY ≠ Production: SETEX OIL AND GAS COMPANY (reported 2001-11)
EWA / Permit operator mismatch
Scheduling: PENERGY ≠ Permit: WINTERSHALL CORPORATION
Resolved via: scheduling → PENERGY
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 2,614 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| TOP/QUEEN (Queen) | 1,004 ft | +1,610 ft |
| TOP/GRAYBURG (Grayburg) | 1,232 ft | +1,382 ft |
| TOP/MCELROY | 1,284 ft | +1,330 ft |
| TOP/SAN ANDRES (San Andres) | 1,320 ft | +1,294 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 1,463–1,466 ft | Perforated |
| 1,480–1,486 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 35 ft | — |
| 8.625" | 826 ft | 265 sx |
| 5.5" | 1,752 ft | 330 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet