Permits
1
Max Depth
4,150 ft
First Permit
1977-11-16
Latest Activity
1977-11-16
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2021-03-25
Shut-In
—
Plugged
—
P-5 Org Status: X
EWA / Production operator mismatch
Scheduling: AFOC LLC ≠ Production: CAMBRIAN MANAGEMENT, LTD. (reported 2016-09)
EWA / Permit operator mismatch
Scheduling: AFOC LLC ≠ Permit: CONTINENTAL OIL COMPANY
Resolved via: scheduling → AFOC LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 3,026 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| LAMAR SHALE (Lamar) | 2,553 ft | +473 ft |
| RAMSEY SAND | 2,586 ft | +440 ft |
| CHERRY CANYON | 3,479 ft | -453 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,569–3,579 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 374 ft | 250 sx |
| 4.5" | 4,119 ft | 350 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet