Permits
1
Max Depth
4,100 ft
First Permit
1981-01-13
Latest Activity
1981-01-13
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2021-03-26
Shut-In
—
Plugged
—
P-5 Org Status: X
EWA / Production operator mismatch
Scheduling: AFOC LLC ≠ Production: CAMBRIAN MANAGEMENT, LTD. (reported 2016-09)
EWA / Permit operator mismatch
Scheduling: AFOC LLC ≠ Permit: CONOCO INC.
Resolved via: scheduling → AFOC LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (6) Elevation 3,071 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| FORD- DELAWARE (Delaware) | 2,500 ft | +571 ft |
| BELL CANYON | 2,538 ft | +533 ft |
| CASTILLE (Castile) | 2,800 ft | +271 ft |
| DELAWARE | 2,800 ft | +271 ft |
| CHERRY CANYON | 3,448 ft | -377 ft |
| BONE SPRING | 5,100 ft | -2,029 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,546–3,568 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 383 ft | 550 sx |
| 2.375" | 3,500 ft | — |
| 4.5" | 4,099 ft | 600 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet