42-115-30474

Final Completion

UNITED PRESBYTERIAN CHURCH

DAWSON County · District 8 · TEXACO INC. · GIN (SILURIAN)

RRC Lookup

Permits

1

Max Depth

11,680 ft

First Permit

1983-02-07

Latest Activity

1983-02-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: TEXACO INC. ≠ Production: PPC OPERATING COMPANY LLC (reported 2015-08)

Resolved via: schedulingTEXACO INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#185489 A TEXACO INC.
received 1983-02-07

Well Details

Well Number
2
Max Depth
11,680 ft
Drill Type
Vertical
County
DAWSON
District
8
Operator
TEXACO INC.

Operator

Location
MIDLAND
P-5 Status
Y (filed 1992-08-03)
Total Permits
4,906

External Links

Live © 2026 Petrora