42-127-31829

Final Completion

ELAINE FIELD/SAN MIGUEL/UNIT

DIMMIT County · District 1 · TESORO PETROLEUM CORPORATION

Permits

3

Max Depth

6,360 ft

First Permit

1979-05-11

Latest Activity

1981-08-03

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1979-06-27

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
2,141–2,211 ftPerforated

Casing (2)

SizeSet DepthCement
2.875"2,100 ft
7"2,213 ft820 sx

Permit History (3)

Applications (3)

#128771 A TESORO PETROLEUM CORPORATION
received 1981-08-03
#50319 A TESORO PETROLEUM CORPORATION
received 1979-05-29
#48333 A TESORO PETROLEUM CORPORATION
received 1979-05-11

Records & Logs

1 completion filing on record.

W-2/G-1 1981-10-23

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in DIMMIT County.

Well Details

Well Number
87
Max Depth
6,360 ft
Drill Type
Vertical
County
DIMMIT
District
1

Operator

Location
SAN ANTONIO
P-5 Status
Inactive (filed 1988-10-17)
Total Permits
85