Permits
2
Max Depth
8,900 ft
First Permit
1979-11-15
Latest Activity
1982-12-16
Lifespan
3 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 750–8,454 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 1,473 ft | 625 sx |
| 4.5" | 8,886 ft | 470 sx |
| 2.375" | — | — |
Permit History (2)
Applications (2)
#180283 A CENTURA INCORPORATED
received 1982-12-16
#63869 A SUEMAUR CORPORATION
received 1979-11-15
Records & Logs
1 completion filing on record.
W-2/G-1 1980-01-29
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in DUVAL County.
Well Details
- Well Number
- 1071
- Max Depth
- 8,900 ft
- Drill Type
- Vertical
- County
- DUVAL
- District
- 4
- Operator
- CENTURA INCORPORATED
Operator
- Name
- CENTURA INC
- Location
- BLUE BELL
- P-5 Status
- Inactive (filed 1985-12-27)
- Total Permits
- 29