Permits
5
Max Depth
8,350 ft
First Permit
1987-11-13
Latest Activity
2006-05-12
Lifespan
18 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
400 bbl/d
Max Pressure
800 psi
Injection Interval
2,000–3,600 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1)
CSV| Formation | Top Depth (MD) |
|---|---|
| YEGUA | 8,035 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 5,555–5,560 ft | Perforated |
| 7,776–7,786 ft | Perforated |
| 8,040–8,064 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 854 ft | 337 sx |
| 7.625" | 6,312 ft | 750 sx |
| 2.875" | 8,174 ft | 300 sx |
Permit History (5)
TALLEY-KIBBE · 8,177 ft
2006-05-12
TALLEY-KIBBE · 8,177 ft
1990-09-04
TALLEY-KIBBE · 8,177 ft
1990-09-04
TALLEY-KIBBE · 8,177 ft
1989-09-20
TALLEY-KIBBE · 8,350 ft
1987-11-13
Applications (5)
Records & Logs
6 completion filings on record · 3 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet