42-131-38998

Final Completion

BARRERA-CHAPA

DUVAL County · District 4 · NOBLE ENERGY INC · WILDCAT

Permits

1

Max Depth

9,200 ft

First Permit

2007-07-12

Latest Activity

2007-07-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2007-08-21

Shut-In

Plugged

2012-10-09

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2007-08

Last Production

2012-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Casing (2)

SizeSet DepthCement
9.625"2,137 ft746 sx
7"7,014 ft210 sx

Permit History (1)

Applications (1)

#641510 A NOBLE ENERGY INC
received 2007-06-27

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2007-10-29 log on file
W-2/G-1 2008-02-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in DUVAL County.

Well Details

Well Number
1
Max Depth
9,200 ft
Drill Type
Vertical
County
DUVAL
District
4
Completed
2007-08-21

Operator

Location
MIDLAND
P-5 Status
Active (filed 2025-08-26)
Cum Oil (all leases)
106,229,170 bbl
Cum Gas (all leases)
245,329,701 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
560