42-133-31540

Final Completion

MURPHY LOUS

EASTLAND County · District 7 · WALLACE CO. INC. · MANGUM WEST (3100)

Permits

1

Max Depth

3,850 ft

First Permit

1978-08-11

Latest Activity

1978-08-11

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-06-10

Shut-In

Plugged

1985-03-06

!

EWA / Permit operator mismatch

Scheduling: WALLACE CO. INC. ≠ Permit: SENTINEL PETROLEUM CORP.

Resolved via: schedulingWALLACE CO. INC.

Operator History

originally filed by SENTINEL PETROLEUM CORP. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,153–3,164 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"103 ft65 sx
2.375"3,055 ft
4.5"3,700 ft225 sx

Permit History (1)

Applications (1)

#30533 A SENTINEL PETROLEUM CORP.
received 1978-08-11

Records & Logs

1 completion filing on record.

W-2/G-1 1979-07-19

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in EASTLAND County.

Well Details

Well Number
1
Max Depth
3,850 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1979-06-10

Operator

Location
HOUSTON
P-5 Status
Inactive (filed 1985-11-13)
Total Permits
15