Permits
1
Max Depth
1,120 ft
First Permit
1979-04-12
Latest Activity
1979-04-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-06-01
Shut-In
—
Plugged
1989-10-18
EWA / Permit operator mismatch
Scheduling: JM ENERGY ≠ Permit: TINEWAL OIL CO., INC.
Resolved via: scheduling → JM ENERGY
Injection / Disposal
Permitted Volume
—
Max Pressure
—
Injection Interval
—
Injected (12mo)
—
Operator History
originally filed by TINEWAL OIL CO., INC. — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 1,091–1,101 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 2.375" | 1,050 ft | — |
| 4.5" | 1,115 ft | 120 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet