42-133-36476
Final CompletionSTEPHENSON
EASTLAND County · District 7 · RICHEY RAY MANAGEMENT CO. INC. · REB (MARBLE FALLS)
Permits
2
Max Depth
4,000 ft
First Permit
1985-04-30
Latest Activity
2005-06-07
Lifespan
20 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-06-03
Shut-In
—
Plugged
2006-08-21
EWA / Production operator mismatch
Scheduling: RICHEY RAY MANAGEMENT CO. INC. ≠ Production: MEHAFFEY INVESTMENTS, INC. (reported 2004-10)
EWA / Permit operator mismatch
Scheduling: RICHEY RAY MANAGEMENT CO. INC. ≠ Permit: MEHAFFEY INVESTMENTS, INC.
Resolved via: scheduling → RICHEY RAY MANAGEMENT CO. INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2006-09
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (7) Elevation 1,528 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| STRAWN | 1,733 ft | -205 ft |
| CADDO | 3,056 ft | -1,528 ft |
| TOP CADDO (Caddo) | 3,056 ft | -1,528 ft |
| MARBLE FALLS | 3,364 ft | -1,836 ft |
| TOP MARBLE FALLS (Marble Falls) | 3,364 ft | -1,836 ft |
| DUFFER | 3,740 ft | -2,212 ft |
| TOP DUFFER (Duffer) | 3,740 ft | -2,212 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 1,733–1,768 ft | Perforated |
| 1,796–1,804 ft | Perforated |
| 3,376–3,396 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 250 ft | 135 sx |
| 8.625" | 250 ft | 135 sx |
| 4.5" | 1,900 ft | 365 sx |
| 4.5" | 3,800 ft | 100 sx |
Permit History (2)
Applications (2)
Records & Logs
6 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- RICHEY RAY MANAGEMENT CO. INC.
- Completed
- 1985-06-03
Operator
- Location
- FORT WORTH
- P-5 Status
- Active (filed 2026-01-15)
- Cum Oil (all leases)
- 1,076,349 bbl
- Cum Gas (all leases)
- 80,584,023 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 136