42-133-36525
Final CompletionJONES ORA B.
EASTLAND County · District 7 · SMITH PIPE OF ABILENE · ADAMS (DUFFER LOWER)
Permits
1
Max Depth
4,000 ft
First Permit
1985-06-11
Latest Activity
1985-06-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-07-02
Shut-In
—
Plugged
1998-06-01
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: RICHEY, RAY MANAGEMENT CO., INC. (reported 1997-03)
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: RICHEY & COMPANY, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-05
Operator History
originally filed by RICHEY & COMPANY, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 1,418 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| STRAWN SAND (Strawn) | 2,264 ft | -846 ft |
| CADDO LIME (Caddo) | 2,544 ft | -1,126 ft |
| MARBLE FALLS | 2,916 ft | -1,498 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,283–3,301 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 175 ft | 150 sx |
| 4.5" | 3,408 ft | 175 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-07-02
Operator
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2014-08-29)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf