42-135-00495

Final Completion

GOLDSMITH C. A. ET AL

ECTOR County · District 8 · CHEVRON U. S. A. INC. · GOLDSMITH (GRAYBURG)

RRC Lookup

Permits

1

Max Depth

4,195 ft

First Permit

1994-03-02

Latest Activity

1994-03-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-02-03

Shut-In

Plugged

2003-12-15

!

EWA / Production operator mismatch

Scheduling: CHEVRON U. S. A. INC. ≠ Production: HILCORP ENERGY COMPANY (reported 2025-11)

Resolved via: schedulingCHEVRON U. S. A. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#421449 A CHEVRON U. S. A. INC.
received 1994-02-24

Well Details

Well Number
80
Max Depth
4,195 ft
Drill Type
Vertical
County
ECTOR
District
8
Completed
1995-02-03

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
622,347,311 bbl
Cum Gas (all leases)
4,191,207,826 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,226

External Links

Live © 2026 Petrora