42-135-05324
Final CompletionSCHARBAUER -J-
ECTOR County · District 8 · M & J ENERGY INC. · GOLDSMITH N. (SAN ANDRES CON.)
Permits
2
Max Depth
8,502 ft
First Permit
1979-04-16
Latest Activity
2002-06-21
Lifespan
23 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-12-19
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: M & J ENERGY INC. ≠ Production: BAKER OPERATING, INC. (reported 2025-12)
Resolved via: production → BAKER OPERATING, INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
FINA OIL & CHEMICAL COMPANY 1993-1994→ DADCO, INC. 1994-1994→ CAPROCK EXPLORATION, INC. 1995-2001→ M & J ENERGY, INC. 2001-2012→ STANOLIND OPERATING LLC 2012-2013→ MEMORIAL PRODUCTION OPER. LLC 2013-2016→ BOAZ ENERGY II OPERATING, LLC 2016-2017→ JTL OPERATING CO., INC 2017-2017→ BAKER OPERATING, INC. 2017-2025
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#521208 A M & J ENERGY, INC.
received 2002-06-20
#46480 A CITIES SERVICE COMPANY
received 1979-04-16
Well Details
- Well Number
- 2
- Max Depth
- 8,502 ft
- Drill Type
- Vertical
- County
- ECTOR
- District
- 8
- Operator
- M & J ENERGY INC.
- Completed
- 1979-12-19
Operator
- Name
- M & J ENGY, INC
- Location
- BRECKENRIDG
- P-5 Status
- Y (filed 2013-05-03)
- Cum Oil (all leases)
- 161,722 bbl
- Cum Gas (all leases)
- 1,059,365 mcf
- Total Permits
- 17