42-135-06103

Final Completion

TXL -B-

ECTOR County · District 8 · TEXACO E & P INC. · GOLDSMITH (5600)

RRC Lookup

Permits

1

Max Depth

5,810 ft

First Permit

1993-04-12

Latest Activity

1993-04-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: TEXACO E & P INC. ≠ Production: PITTS ENERGY CO. (reported 2025-05)

Resolved via: schedulingTEXACO E & P INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#410576 A TEXACO E & P INC.
received 1993-04-08

Well Details

Well Number
2
Max Depth
5,810 ft
Drill Type
Vertical
County
ECTOR
District
8

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
176,155,764 bbl
Cum Gas (all leases)
1,401,949,654 mcf
Activities
OPRS/O
Total Permits
3,332

External Links

Live © 2026 Petrora