42-149-31762
Final CompletionNEWMAN
FAYETTE County · District 3 · SANTA FE MINERALS INC. · GIDDINGS (AUSTIN CHALK-3)
Permits
1
Max Depth
8,300 ft
First Permit
1984-03-27
Latest Activity
1984-03-27
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-05-28
Shut-In
—
Plugged
1986-04-03
EWA / Permit operator mismatch
Scheduling: SANTA FE MINERALS INC. ≠ Permit: SANTA FE - WINDSOR PRODUCING CO.
Resolved via: scheduling → SANTA FE MINERALS INC.
Operator History
originally filed by SANTA FE - WINDSOR PRODUCING CO. — asset transferred
Formation Tops (7) Elevation 301 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| PECAN GAP | 6,670 ft | -6,369 ft |
| AUSTIN CHALK | 6,913 ft | -6,612 ft |
| EAGLEFORD (Eagle Ford) | 7,549 ft | -7,248 ft |
| FALSE BUDA | 7,608 ft | -7,307 ft |
| BUDA RESERVOIR (Buda) | 7,640 ft | -7,339 ft |
| DEL RIO | 7,700 ft | -7,399 ft |
| GEORGETOWN | 7,726 ft | -7,425 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 6,917–7,544 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 3,107 ft | 650 sx |
| 5.5" | 7,774 ft | 500 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 8,300 ft
- Drill Type
- Vertical
- County
- FAYETTE
- District
- 3
- Operator
- SANTA FE MINERALS INC.
- Completed
- 1984-05-28
Operator
- Location
- DALLAS
- P-5 Status
- Inactive (filed 1993-05-20)
- Total Permits
- 133