42-151-00698

CARTER, B. F.

FISHER County · District 7 · L.C.S. PRODUCTION COMPANY

Permits

2

Max Depth

5,100 ft

First Permit

2021-07-23

Latest Activity

2024-04-17

Lifespan

3 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. The nearest completed wells below show what to expect at this location.

Check this well's filings at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported — this well has no filings of its own yet.

Cross-section
42-151-33362 B. F. CARTER · L.C.S. PRODUCTION COMPANY
0.1 mi
Coleman Junction 2,197'NOODLE CREEK - DISPOSAL 2,639'Saddle Creek 2,792'FLIPPEN - DISPOSAL 2,904'Cisco 2,995'HOPE - DISPOSAL 3,015'BRECKENRIDGE - DISPOSAL 3,174'DOTHAN SAND - DISPOSAL CRYSTAL FALLS - DISPOSAL San Andres
42-151-33149 WELCH · L.C.S. PRODUCTION COMPANY
0.1 mi
Coleman Junction 2,221'DOTHAN SAND - DISPOSAL 2,555'NOODLE CREEK - DISPOSAL 2,661'Saddle Creek 2,836'FLIPPEN - DISPOSAL 2,928'Cisco 3,014'HOPE - DISPOSAL 3,036'CRYSTAL FALLS - DISPOSAL 3,110'BRECKENRIDGE - DISPOSAL 3,248'San Andres
42-151-33268 CARTER, B. F. · L.C.S. PRODUCTION COMPANY
0.2 mi
Coleman Junction 2,297'DOTHAN SAND - DISPOSAL 2,520'NOODLE CREEK - DISPOSAL 2,625'Saddle Creek 2,798'FLIPPEN - DISPOSAL 2,892'Cisco 3,030'HOPE - DISPOSAL 3,042'CRYSTAL FALLS - DISPOSAL 3,093'BRECKENRIDGE - DISPOSAL 3,206'San Andres
42-151-33254 CARTER, B. F. · L.C.S. PRODUCTION COMPANY
0.2 mi
Coleman Junction 2,186'NOODLE CREEK - DISPOSAL 2,639'Saddle Creek 2,794'FLIPPEN - DISPOSAL 2,898'Cisco 2,987'HOPE - DISPOSAL 3,016'BRECKENRIDGE - DISPOSAL 3,178'San Andres DOTHAN SAND - DISPOSAL CRYSTAL FALLS - DISPOSAL
42-151-33143 WELCH · L.C.S. PRODUCTION COMPANY
0.2 mi
Coleman Junction 2,209'DOTHAN SAND - DISPOSAL 2,543'NOODLE CREEK - DISPOSAL 2,649'Saddle Creek 2,829'FLIPPEN - DISPOSAL 2,921'Cisco 3,010'HOPE - DISPOSAL 3,035'CRYSTAL FALLS - DISPOSAL 3,107'BRECKENRIDGE - DISPOSAL 3,240'San Andres
42-151-33150 CARTER, B. F. · L.C.S. PRODUCTION COMPANY
0.3 mi
Coleman Junction 1,870'NOODLE CREEK - DISPOSAL 2,670'FLIPPEN - DISPOSAL 2,899'CRYSTAL FALLS - DISPOSAL DOTHAN SAND - DISPOSAL HOPE - DISPOSAL BRECKENRIDGE - DISPOSAL San Andres Saddle Creek Cisco
42-151-33356 B.F. CARTER · L.C.S. PRODUCTION COMPANY
0.3 mi
Coleman Junction 2,173'NOODLE CREEK - DISPOSAL 2,623'Saddle Creek 2,786'FLIPPEN - DISPOSAL 2,884'Cisco 2,984'HOPE - DISPOSAL 2,999'BRECKENRIDGE - DISPOSAL 3,145'DOTHAN SAND - DISPOSAL CRYSTAL FALLS - DISPOSAL San Andres
42-151-33148 WELCH · L.C.S. PRODUCTION COMPANY
0.3 mi
Coleman Junction 2,338'DOTHAN SAND - DISPOSAL 2,557'NOODLE CREEK - DISPOSAL 2,664'Saddle Creek 2,824'FLIPPEN - DISPOSAL 2,933'Cisco 3,029'HOPE - DISPOSAL 3,053'CRYSTAL FALLS - DISPOSAL 3,120'BRECKENRIDGE - DISPOSAL 3,261'San Andres

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section).

Casing (3)

SizeSet DepthCement
7.625"155 ft
2"4,873 ft
5.5"4,958 ft

Permit History (2)

Applications (2)

#898809 A L.C.S. PRODUCTION COMPANY
received 2024-04-11
#871433 A L.C.S. PRODUCTION COMPANY
received 2021-07-21

Records & Logs

2 completion filings on record.

W-2/G-1 1955-06-10
W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 32.605384
Lon -100.181723

Well Details

Well Number
14R
Max Depth
5,100 ft
Drill Type
Vertical
County
FISHER
District
7

Operator

Location
ABILENE
P-5 Status
Active (filed 2025-07-08)
Cum Oil (all leases)
7,065,175 bbl
Cum Gas (all leases)
3,085,370 mcf
Activities
OPRS/G, OPRS/O
Total Permits
1,688