42-151-31103

Final Completion

SMITH

FISHER County · District 7 · SMITH PIPE OF ABILENE · NOODLE NW. (CANYON SD. 4100)

Permits

1

Max Depth

4,176 ft

First Permit

1980-05-22

Latest Activity

1980-05-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-07-14

Shut-In

Plugged

2006-12-13

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEAGO OIL, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-03

Operator History

originally filed by SEAGO OIL, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 1,843 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
NOODLE CREEK2,650 ft-807 ft
CAYON4,164 ft-2,321 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
4,166–4,176 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"105 ft125 sx
4.5"4,353 ft275 sx

Permit History (1)

Applications (1)

#81774 A SEAGO OIL, INC.
received 1980-05-22

Records & Logs

1 completion filing on record.

W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in FISHER County.

Well Details

Well Number
2
Max Depth
4,176 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1980-07-14

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf