42-151-31726

Final Completion

GREEN

FISHER County · District 7 · E.S.I. · GYP CREEK (ELLENBURGER)

Permits

1

Max Depth

6,400 ft

First Permit

1983-09-30

Latest Activity

1983-09-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-02-22

Shut-In

Plugged

1985-11-01

!

EWA / Permit operator mismatch

Scheduling: E.S.I. ≠ Permit: MECCA ENERGY, INC.

Resolved via: schedulingE.S.I.

Operator History

originally filed by MECCA ENERGY, INC. — asset transferred

Formation Tops (5) Elevation 1,868 ft (DF)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
TOP NOODLE CREEK3,295 ft-1,427 ft
TOP PALO PINTO LS (Palo Pinto)5,495 ft-3,627 ft
TOP ODOM LS5,863 ft-3,995 ft
TOP MISSISSIPPIAN DETRITAL (Mississippian)6,022 ft-4,154 ft
TOP ELLENBURGER DOLO (Ellenburger)6,220 ft-4,352 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
6,213–6,227 ftOpen hole

Casing (2)

SizeSet DepthCement
8.625"162 ft150 sx
4.5"6,213 ft350 sx

Permit History (1)

Applications (1)

#215864 A MECCA ENERGY, INC.
received 1983-08-22

Records & Logs

2 completion filings on record.

W-2/G-1 1984-03-12
W-2/G-1 1984-03-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in FISHER County.

Well Details

Well Number
1
Max Depth
6,400 ft
Drill Type
Vertical
County
FISHER
District
7
Operator
E.S.I.
Completed
1984-02-22

Operator

Name
E.S.I
Location
ABILENE
P-5 Status
Inactive (filed 1997-01-17)
Total Permits
24