42-151-31814

Final Completion

JOHNSON AL

FISHER County · District 7 · TXO PRODUCTION CORP. · BONNER (FLIPPEN)

Permits

1

Max Depth

3,825 ft

First Permit

1984-04-23

Latest Activity

1984-04-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-10-01

Shut-In

Plugged

1985-08-26

Formation Tops (4) Elevation 2,120 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
SEDWICK2,695 ft-575 ft
DOTHAM3,204 ft-1,084 ft
SADDLE CREEK 3,482 ft-1,362 ft
FLIPPEN3,511 ft-1,391 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
3,526–3,530 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"204 ft100 sx
4.5"3,624 ft500 sx

Permit History (1)

Applications (2)

#236556 A TXO PRODUCTION CORP.
received 1984-05-18
#236556 A TXO PRODUCTION CORP.
received 1984-04-23

Records & Logs

2 completion filings on record.

W-2/G-1 1984-12-07
W-2/G-1 1985-03-21

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in FISHER County.

Well Details

Well Number
1
Max Depth
3,825 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1984-10-01

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1990-11-02)
Total Permits
3,227