42-157-30898
Final CompletionDAVIS J. H. P. ESTATE
FORT BEND County · District 3 · JETTA OPERATING COMPANY INC. · THOMPSON SOUTHEAST (FRIO UP.)
Permits
2
Max Depth
5,800 ft
First Permit
1978-02-13
Latest Activity
1990-08-14
Lifespan
12 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1991-01-04
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: JETTA OPERATING COMPANY INC. ≠ Production: P.O.&G. OPERATING, LLC (reported 2026-04)
EWA / Permit operator mismatch
Scheduling: JETTA OPERATING COMPANY INC. ≠ Permit: EXXON CORP.
Resolved via: production → P.O.&G. OPERATING, LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
6,000 bbl/d
Max Pressure
700 psi
Injection Interval
3,700–4,300 ft
Injected (12mo)
—
Monthly injected volume (bbl, from H-10 filings through 2025-07-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2) Elevation 65 ft (DF)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| TOP OF ANAHUAC (Anahuac) | 4,265 ft | -4,200 ft |
| TOP OF MARGINUILIAN | 4,864 ft | -4,799 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (9)
| Interval | Type |
|---|---|
| 3,766–3,796 ft | Perforated |
| 4,032–4,052 ft | Perforated |
| 4,912–4,922 ft | Perforated |
| 4,933–4,940 ft | Perforated |
| 5,027–5,045 ft | Perforated |
| 5,052–5,054 ft | Perforated |
| 5,083–5,098 ft | Perforated |
| 5,098–5,105 ft | Perforated |
| ?–4,970 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 16" | 65 ft | — |
| 9.625" | 1,486 ft | 500 sx |
| 9.625" | 1,497 ft | 550 sx |
| 5.5" | 5,296 ft | 330 sx |
Permit History (2)
Applications (2)
Records & Logs
11 completion filings on record · 1 with log images at RRC.
+5 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 57
- Max Depth
- 5,800 ft
- Drill Type
- Vertical
- County
- FORT BEND
- District
- 3
- Operator
- JETTA OPERATING COMPANY INC.
- Completed
- 1991-01-04
Operator
- Name
- JETTA OPER CO, INC
- Location
- FORT WORTH
- P-5 Status
- Active (filed 2024-06-14)
- Cum Oil (all leases)
- 41,367,118 bbl
- Cum Gas (all leases)
- 23,397,990 mcf
- Activities
- CSGD/G, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 602