42-157-30988
Final CompletionRICHTER GAS UNIT
FORT BEND County · District 3 · CHAPMAN ROGER INC. · TAVENER (YEGUA 7600)
Permits
2
Max Depth
8,350 ft
First Permit
1979-05-21
Latest Activity
1985-05-22
Lifespan
6 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-08-07
Shut-In
—
Plugged
1986-02-22
Formation Tops (2) Elevation 109 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| YEGUA | 7,656 ft | -7,547 ft |
| 7950COOK MOUNTAIN | 7,970 ft | -7,861 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 4,207–4,210 ft | Perforated |
| 7,656–7,670 ft | Perforated |
| 7,970–7,982 ft | Perforated |
Casing (6)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 2,354 ft | 1,540 sx |
| 2.375" | 7,516 ft | — |
| 7" | 7,833 ft | 525 sx |
| 7" | 7,833 ft | 525 sx |
| 5" | 7,854 ft | — |
| 5" | 8,348 ft | 102 sx |
Permit History (2)
Applications (2)
#275697 A CHAPMAN, ROGER INC.
received 1985-05-14
#48909 A CHAPMAN OIL
received 1979-05-21
Records & Logs
3 completion filings on record.
W-2/G-1 1985-04-18
W-2/G-1 1985-06-05
W-2/G-1 1979-09-05
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in FORT BEND County.
Well Details
- Well Number
- 1U
- Max Depth
- 8,350 ft
- Drill Type
- Vertical
- County
- FORT BEND
- District
- 3
- Operator
- CHAPMAN ROGER INC.
- Completed
- 1979-08-07
Operator
- Name
- CHAPMAN, ROGER INC
- Location
- HOUSTON
- P-5 Status
- Inactive (filed 1990-10-26)
- Total Permits
- 21