42-157-31079
Final CompletionDAVIS J. H. P. ESTATE
FORT BEND County · District 3 · JETTA OPERATING COMPANY INC. · THOMPSON SOUTHEAST (FRIO UP.)
Permits
1
Max Depth
5,700 ft
First Permit
1980-03-17
Latest Activity
1980-03-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1999-08-19
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: JETTA OPERATING COMPANY INC. ≠ Production: P.O.&G. OPERATING, LLC (reported 2026-04)
EWA / Permit operator mismatch
Scheduling: JETTA OPERATING COMPANY INC. ≠ Permit: EXXON CORP.
Resolved via: production → P.O.&G. OPERATING, LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
10,000 bbl/d
Max Pressure
1,000 psi
Injection Interval
4,100–4,400 ft
Injected (12mo)
167,699 bbl
Permitted Volume
10,000 bbl/d
Max Pressure
2,450 psi
Injection Interval
4,900–5,190 ft
Injected (12mo)
167,699 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-07-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 68 ft (DF)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| ANAHUAC | 4,400 ft | -4,332 ft |
| FRIO | 4,900 ft | -4,832 ft |
| FRIO | 5,710 ft | -5,642 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (16)
| Interval | Type |
|---|---|
| 4,121–4,134 ft | Perforated |
| 4,150–4,156 ft | Perforated |
| 4,164–4,174 ft | Perforated |
| 4,180–4,200 ft | Perforated |
| 4,204–4,214 ft | Perforated |
| 4,264–4,282 ft | Perforated |
| 4,264–4,320 ft | Perforated |
| 4,267–4,328 ft | Perforated |
| 4,288–4,306 ft | Perforated |
| 4,320–4,320 ft | Perforated |
| 4,320–4,340 ft | Perforated |
| 4,348–4,362 ft | Perforated |
| 4,881–4,890 ft | Perforated |
| 4,904–4,908 ft | Perforated |
| 4,920–4,928 ft | Perforated |
+1 more intervals
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 1,498 ft | 1,050 sx |
| 2.375" | 4,914 ft | — |
| 7" | 5,245 ft | 4,700 sx |
| 7" | 5,254 ft | 470 sx |
Permit History (1)
Applications (1)
Records & Logs
11 completion filings on record.
+5 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 61
- Max Depth
- 5,700 ft
- Drill Type
- Vertical
- County
- FORT BEND
- District
- 3
- Operator
- JETTA OPERATING COMPANY INC.
- Completed
- 1999-08-19
Operator
- Name
- JETTA OPER CO, INC
- Location
- FORT WORTH
- P-5 Status
- Active (filed 2024-06-14)
- Cum Oil (all leases)
- 41,367,118 bbl
- Cum Gas (all leases)
- 23,397,990 mcf
- Activities
- CSGD/G, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 602