42-159-30209

Final Completion

RUTHERFORD KATE A

FRANKLIN County · District 6 · EXXON MOBIL CORPORATION · TALCO

RRC Lookup

Permits

2

Max Depth

4,620 ft

First Permit

1979-01-10

Latest Activity

1986-04-02

Lifespan

7 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-06-02

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: EXXON MOBIL CORPORATION ≠ Production: J.P. OIL COMPANY, INC. (reported 2025-11)

!

EWA / Permit operator mismatch

Scheduling: EXXON MOBIL CORPORATION ≠ Permit: MOBIL PRODUCING TX. & N.M. INC.

Resolved via: productionJ.P. OIL COMPANY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#300717 A MOBIL PRODUCING TX. & N.M. INC.
received 1986-02-27
#40564 A MOBIL OIL CORPORATION
received 1979-01-10

Well Details

Well Number
7
Max Depth
4,620 ft
Drill Type
Vertical
County
FRANKLIN
District
6
Completed
1979-06-02

Operator

Location
SPRING
P-5 Status
Y (filed 2026-01-04)
Cum Oil (all leases)
155,164,556 bbl
Cum Gas (all leases)
2,032,561,175 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G
Total Permits
1,223

External Links

Live © 2026 Petrora