42-161-32050
Final CompletionHILL RANCH UNIT 2
FREESTONE County · District 5 · ENCANA OIL & GAS(USA) INC. · NAN-SU-GAIL (CV CONSOLIDATED)
Permits
1
Max Depth
12,500 ft
First Permit
2001-04-02
Latest Activity
2001-04-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2001-06-04
Shut-In
—
Plugged
2010-11-04
EWA / Permit operator mismatch
Scheduling: ENCANA OIL & GAS(USA) INC. ≠ Permit: MATADOR OPERATING COMPANY
Resolved via: scheduling → ENCANA OIL & GAS(USA) INC.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2001-06
Last Production
2010-11
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (6) Elevation 353 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CHALK | 3,478 ft | -3,125 ft |
| WOODBINE | 4,257 ft | -3,904 ft |
| GLENROSE (Glen Rose) | 6,140 ft | -5,787 ft |
| MASS/ANHYDRITE | 7,076 ft | -6,723 ft |
| PETTIT | 7,982 ft | -7,629 ft |
| COTTON VALLEY | 10,080 ft | -9,727 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 11,282–11,285 ft | Perforated |
| 11,307–11,310 ft | Perforated |
| 11,378–11,381 ft | Perforated |
| 11,431–11,434 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 122 ft | 678 sx |
| 8.625" | 1,585 ft | — |
| 5.5" | 11,953 ft | 1,647 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 12,500 ft
- Drill Type
- Vertical
- County
- FREESTONE
- District
- 5
- Operator
- ENCANA OIL & GAS(USA) INC.
- Completed
- 2001-06-04
Operator
- Location
- DENVER
- P-5 Status
- Inactive (filed 2019-12-19)
- Cum Oil (all leases)
- 179,366,011 bbl
- Cum Gas (all leases)
- 1,595,760,759 mcf
- Total Permits
- 3,078