42-163-34331

PRODUCING Horizontal

HILLMAN 303

FRIO County · District 1 · JAVELIN ENERGY PARTNERS MGMT LLC · EAGLEVILLE (EAGLE FORD-1)

Permits

1

Max Depth

9,000 ft

First Permit

2023-05-01

Latest Activity

2023-05-01

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2024-03-29

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2023-06

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 489 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
ESCONDIDO 5,358 ft-4,869 ft
OLMOS 6,256 ft-5,767 ft
ANACACHO 7,228 ft-6,739 ft
AUSTIN CHALK - H2S (Austin Chalk)7,540 ft-7,051 ft
EAGLE FORD - H2S (Eagle Ford)8,309 ft-7,820 ft
BUDA - H2S (Buda)
GEORGETOWN - H2S (Georgetown)
NAVARRO
PEARSALL
QUEEN CITY

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-163-34332 HILLMAN 304 · JAVELIN ENERGY PARTNERS MGMT LLC
0.0 mi
Escondido 5,296'Olmos 6,186'Anacacho 7,143'Austin Chalk 7,488'Eagle Ford 8,304'Buda Queen City Pearsall Georgetown Navarro
42-163-34330 HILLMAN 302 · JAVELIN ENERGY PARTNERS MGMT LLC
0.0 mi
Escondido 5,302'Olmos 6,189'Anacacho 7,167'Austin Chalk 7,481'Eagle Ford 8,313'Navarro Buda Queen City Pearsall Georgetown
42-163-34329 HILLMAN 301 · JAVELIN ENERGY PARTNERS MGMT LLC
0.0 mi
Escondido 5,293'Olmos 6,191'Anacacho 7,155'Austin Chalk 7,487'Eagle Ford 8,310'Navarro Buda Queen City Pearsall Georgetown
42-163-34333 HILLMAN 305 · JAVELIN ENERGY PARTNERS MGMT LLC
0.0 mi
Escondido 5,287'Olmos 6,194'Anacacho 7,132'Austin Chalk 7,477'Eagle Ford 8,294'Georgetown Buda Queen City Pearsall Navarro
42-163-34371 THUNDERBIRD 101HZ · JAVELIN ENERGY PARTNERS MGMT LLC
0.1 mi
Escondido 5,056'Olmos 6,183'Anacacho 7,452'Austin Chalk 7,889'Eagle Ford 8,309'Buda Queen City Pearsall Georgetown Navarro
42-163-34370 THUNDERBIRD 101HY · JAVELIN ENERGY PARTNERS MGMT LLC
0.1 mi
Escondido 5,054'Olmos 6,194'Anacacho 7,461'Austin Chalk 7,894'Eagle Ford 8,314'Navarro Buda Queen City Pearsall Georgetown
42-163-34369 THUNDERBIRD 101HX · JAVELIN ENERGY PARTNERS MGMT LLC
0.1 mi
Escondido 5,054'Olmos 6,193'Anacacho 7,456'Austin Chalk 7,895'Eagle Ford 8,318'Navarro Buda Queen City Pearsall Georgetown
42-163-34368 THUNDERBIRD 101HW · JAVELIN ENERGY PARTNERS MGMT LLC
0.1 mi
Escondido 5,130'Olmos 6,186'Anacacho 7,479'Austin Chalk 7,915'Eagle Ford 8,312'Georgetown Buda Queen City Pearsall Navarro

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
8,460–16,849 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"3,106 ft1,023 sx
5.5"16,890 ft2,680 sx

Permit History (1)

Applications (1)

#889984 A JAVELIN ENERGY PARTNERS MGMT LLC
received 2023-04-21

Records & Logs

2 completion filings on record · 2 with log images at RRC.

W-2/G-1 2024-05-09 log on file
W-2/G-1 2023-11-21 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 28.656082
Lon -98.916949

Well Details

Well Number
A303
Max Depth
9,000 ft
Drill Type
Horizontal
County
FRIO
District
1
Completed
2024-03-29

Operator

Location
HOUSTON
P-5 Status
X (filed 2026-02-24)
Cum Oil (all leases)
44,995,326 bbl
Cum Gas (all leases)
357,450,617 mcf
Activities
OPRS/G, OPRS/O
Total Permits
228