42-163-34336

Final Completion Horizontal

TALON 101HB

FRIO County · District 1 · JAVELIN ENERGY PARTNERS MGMT LLC · BRISCOE RANCH (EAGLEFORD)

Permits

1

Max Depth

9,000 ft

First Permit

2024-04-23

Latest Activity

2024-04-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2024-09-05

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2024-09

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 518 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
ESCONDIDO 5,258 ft-4,740 ft
OLMOS 6,126 ft-5,608 ft
ANACACHO 6,657 ft-6,139 ft
AUSTIN CHALK - H2S (Austin Chalk)7,017 ft-6,499 ft
EAGLE FORD - H2S (Eagle Ford)7,812 ft-7,294 ft
BUDA - H2S (Buda)
GEORGETOWN - H2S (Georgetown)
NAVARRO
PEARSALL
QUEEN CITY

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-163-34337 TALON 101HC · JAVELIN ENERGY PARTNERS MGMT LLC
0.0 mi
Escondido 5,260'Olmos 6,119'Austin Chalk 6,998'Eagle Ford 7,817'Anacacho Georgetown Navarro Buda Queen City Pearsall
42-163-34335 TALON 101HA · JAVELIN ENERGY PARTNERS MGMT LLC
0.0 mi
Escondido 5,269'Olmos 6,122'Anacacho 6,674'Austin Chalk 7,018'Eagle Ford 7,812'Pearsall Navarro Georgetown Buda Queen City
42-163-34291 TORTUGA · VENADO OPERATING COMPANY LLC
1.1 mi
Escondido 5,189'Olmos 6,036'Austin Chalk 7,035'Eagle Ford 7,812'Eagle Ford 7,831'LEF_B 7,890'Anacacho Navarro Buda Georgetown Queen City Pearsall
42-163-34290 TORTUGA · VENADO OPERATING COMPANY LLC
1.1 mi
Escondido 5,187'Olmos 6,049'Austin Chalk 7,029'Eagle Ford 7,819'Eagle Ford 7,839'LEF_B 7,902'Pearsall Anacacho Buda Queen City Georgetown Navarro
42-163-34289 TALON 306 · VENADO OPERATING COMPANY LLC
1.1 mi
Escondido 5,169'Olmos 6,019'Anacacho 6,968'Austin Chalk 7,320'Eagle Ford 7,900'Buda 7,985'Queen City Navarro Pearsall Georgetown
42-163-34288 TALON 305 · VENADO OPERATING COMPANY LLC
1.1 mi
Escondido 5,183'Olmos 6,036'Anacacho 7,057'Eagle Ford 7,845'Eagle Ford 7,866'LEF_B 7,927'Queen City Austin Chalk Buda Navarro
42-163-34287 TALON 304 · VENADO OPERATING COMPANY LLC
1.1 mi
Escondido 5,178'Olmos 6,031'Anacacho 7,078'Eagle Ford 7,858'Eagle Ford 7,880'LEF_B 7,941'Georgetown Navarro Buda Austin Chalk Queen City Pearsall
42-163-34353 TORTUGA · JAVELIN ENERGY PARTNERS MGMT LLC
1.1 mi
Escondido 4,955'Olmos 5,783'Anacacho 6,649'Austin Chalk 7,005'Eagle Ford 7,777'Georgetown Buda Queen City Pearsall Navarro

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
7,950–20,324 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"4,354 ft1,398 sx
5.5"20,365 ft3,389 sx

Permit History (1)

Applications (1)

#898936 A JAVELIN ENERGY PARTNERS MGMT LLC
received 2024-04-17

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2025-10-20
W-2/G-1 2024-10-22 log on file

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 28.691122
Lon -98.928832

Well Details

Well Number
101HB
Max Depth
9,000 ft
Drill Type
Horizontal
County
FRIO
District
1
Completed
2024-09-05

Operator

Location
HOUSTON
P-5 Status
X (filed 2026-02-24)
Cum Oil (all leases)
44,995,326 bbl
Cum Gas (all leases)
357,450,617 mcf
Activities
OPRS/G, OPRS/O
Total Permits
228