42-167-31151
Final CompletionMORSE EUGENE
GALVESTON County · District 3 · FIRST ENERGY CORP. OF MISS. · DUKE RUDMAN (12 100)
Permits
3
Max Depth
13,400 ft
First Permit
1988-02-12
Latest Activity
1989-06-19
Lifespan
1 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1988-06-09
Shut-In
—
Plugged
1990-12-06
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (7) Elevation 36 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| TOP FRIO (Frio) | 8,234 ft | -8,198 ft |
| TO ANOMALINA | 10,505 ft | -10,469 ft |
| TOP ANOMALINA | 10,505 ft | -10,469 ft |
| TEX '2' | 11,175 ft | -11,139 ft |
| TEX '2' SHALE | 11,301 ft | -11,265 ft |
| TEX '2' SAND | 11,628 ft | -11,592 ft |
| 12,100' SAND | 11,939 ft | -11,903 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 10,624–10,630 ft | Perforated |
| 11,948–11,950 ft | Perforated |
| 12,023–12,029 ft | Perforated |
| 12,040–12,058 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 40.75" | 3,140 ft | 1,965 sx |
| 10.75" | 3,140 ft | 1,965 sx |
| 7.625" | 11,150 ft | 525 sx |
| 5.5" | 13,300 ft | 100 sx |
Permit History (3)
Applications (3)
Records & Logs
6 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 13,400 ft
- Drill Type
- Vertical
- County
- GALVESTON
- District
- 3
- Operator
- FIRST ENERGY CORP. OF MISS.
- Completed
- 1988-06-09
Operator
- Location
- JACKSON
- P-5 Status
- Inactive (filed 1993-02-19)
- Total Permits
- 32