Permits
3
Max Depth
9,845 ft
First Permit
1981-07-03
Latest Activity
1990-12-18
Lifespan
9 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1981-11-16
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1996-02
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 3,016 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| SAN ANDRES | 3,780 ft | -764 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,824–3,849 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 20" | 40 ft | — |
| 13.375" | 510 ft | — |
| 9.625" | 3,397 ft | — |
| 5.5" | 9,845 ft | — |
Permit History (3)
Applications (3)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet