Permits
2
Max Depth
4,000 ft
First Permit
1998-04-27
Latest Activity
2000-06-07
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
550 bbl/d
Max Pressure
1,250 psi
Injection Interval
3,500–3,950 ft
Injected (12mo)
83,925 bbl
Monthly injected volume (bbl, from H-10 filings through 2026-05-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 2,981 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| SANTA ROSA | 1,050 ft | +1,931 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,552–3,755 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 265 ft | 265 sx |
| 5.5" | 3,965 ft | 800 sx |
Permit History (2)
Applications (2)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 7
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- GARZA
- District
- 8
- Operator
- STELZER DRILLING CO. INC.
Operator
- Location
- POST
- P-5 Status
- Active (filed 2025-09-17)
- Cum Oil (all leases)
- 3,134,077 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O
- Total Permits
- 18