42-175-31222

Final Completion

JACOB -A-

GOLIAD County · District 2 · TXO PRODUCTION CORP. · FANNIN NORTH (3600)

Permits

4

Max Depth

3,950 ft

First Permit

1979-06-13

Latest Activity

1984-07-31

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-07-03

Shut-In

Plugged

1985-10-09

Formation Tops (1) Elevation 158 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
TOP OF FRIO (Frio)2,960 ft-2,802 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (4)

IntervalType
2,478–2,484 ftPerforated
3,055–3,060 ftPerforated
3,376–3,380 ftPerforated
3,516–3,520 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"538 ft200 sx
8.625"538 ft200 sx
2.875"3,762 ft150 sx

Permit History (4)

Applications (4)

#246863 A TXO PRODUCTION CORP.
received 1984-07-30
#240438 A TXO PRODUCTION CORP.
received 1984-05-24
#183902 A TXO PRODUCTION CORP.
received 1982-12-31
#50654 A TEXAS OIL & GAS CORP.
received 1979-06-13

Records & Logs

7 completion filings on record.

W-2/G-1 1984-08-17
W-2/G-1 1984-08-06
W-2/G-1 1984-07-02
W-2/G-1 1984-07-02
W-2/G-1 1983-10-24
W-2/G-1 1983-10-24

+1 more filings

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GOLIAD County.

Well Details

Well Number
2
Max Depth
3,950 ft
Drill Type
Vertical
County
GOLIAD
District
2
Completed
1979-07-03

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1990-11-02)
Total Permits
3,227