42-175-31308
Final CompletionMCCORD J.E.
GOLIAD County · District 2 · FIRST MATAGORDA CORPORATION · DALLAS HUSKY (VICKSBURG)
Permits
1
Max Depth
10,500 ft
First Permit
1980-02-04
Latest Activity
1980-02-04
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-04-30
Shut-In
—
Plugged
1982-06-28
EWA / Permit operator mismatch
Scheduling: FIRST MATAGORDA CORPORATION ≠ Permit: MATAGORDA PRODUCTION CO.
Resolved via: scheduling → FIRST MATAGORDA CORPORATION
Operator History
originally filed by MATAGORDA PRODUCTION CO. — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (2)
| Interval | Type |
|---|---|
| 3,053–9,048 ft | Perforated |
| 4,728–4,738 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 2,496 ft | 1,385 sx |
| 2.375" | 4,683 ft | — |
| 5.5" | 9,471 ft | 2,680 sx |
| 5.5" | 9,473 ft | 2,680 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 10,500 ft
- Drill Type
- Vertical
- County
- GOLIAD
- District
- 2
- Operator
- FIRST MATAGORDA CORPORATION
- Completed
- 1980-04-30
Operator
- Name
- FIRST MATAGORDA CORP
- Location
- OKLAHOMA CI, TY
- P-5 Status
- Inactive (filed 1986-09-30)
- Total Permits
- 16