42-175-31485

Final Completion

RAMSEY

GOLIAD County · District 2 · LIGHTNING OIL COMPANY · BIG OAK (WILCOX 10500)

Permits

1

Max Depth

11,500 ft

First Permit

1981-05-12

Latest Activity

1981-05-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-10-16

Shut-In

Plugged

1988-06-16

!

EWA / Permit operator mismatch

Scheduling: LIGHTNING OIL COMPANY ≠ Permit: TEMPLETON ENERGY, INC

Resolved via: schedulingLIGHTNING OIL COMPANY

Operator History

originally filed by TEMPLETON ENERGY, INC — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
10,545–10,552 ftPerforated

Casing (3)

SizeSet DepthCement
10.75"1,990 ft1,030 sx
7.625"9,394 ft500 sx
2"10,470 ft

Permit History (1)

Applications (1)

#118211 A TEMPLETON ENERGY, INC
received 1981-05-12

Records & Logs

1 completion filing on record.

W-2/G-1 1982-11-17

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GOLIAD County.

Well Details

Well Number
1
Max Depth
11,500 ft
Drill Type
Vertical
County
GOLIAD
District
2
Completed
1982-10-16

Operator

Location
SAN ANTONIO
P-5 Status
Active (filed 2025-06-17)
Cum Oil (all leases)
8,409 bbl
Cum Gas (all leases)
4,675,348 mcf
Activities
OPRS/G
Total Permits
72