42-175-31582

Final Completion

COLETO CREEK (SWOBODA)

GOLIAD County · District 2 · INTRAMERICAN OIL & MINERALS INC · SWOBODA (FRIO 3680)

Permits

1

Max Depth

4,500 ft

First Permit

1981-12-04

Latest Activity

1981-12-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-03-26

Shut-In

Plugged

1986-03-29

!

EWA / Permit operator mismatch

Scheduling: INTRAMERICAN OIL & MINERALS INC ≠ Permit: INTREPID DEVELOPMENT CO.

Resolved via: schedulingINTRAMERICAN OIL & MINERALS INC

Operator History

originally filed by INTREPID DEVELOPMENT CO. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,681–3,682 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"516 ft200 sx
2.375"3,606 ft
4.5"3,749 ft680 sx

Permit History (1)

Applications (1)

#142728 A INTREPID DEVELOPMENT CO.
received 1981-12-04

Records & Logs

1 completion filing on record.

W-2/G-1 1982-04-08

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GOLIAD County.

Well Details

Well Number
1
Max Depth
4,500 ft
Drill Type
Vertical
County
GOLIAD
District
2
Completed
1982-03-26

Operator

Location
DALLAS
P-5 Status
Inactive (filed 1990-02-05)
Total Permits
7