42-177-30487

Final Completion

GRIFFIN G.G. ET AL

GONZALES County · District 1 · MARSHALL & WINSTON INC. · WINSTON (AUSTIN CHALK)

RRC Lookup

Permits

1

Max Depth

7,500 ft

First Permit

1979-02-13

Latest Activity

1979-02-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-03-31

Shut-In

Plugged

1996-05-03

!

EWA / Production operator mismatch

Scheduling: MARSHALL & WINSTON INC. ≠ Production: ORIGIN PROD CO GONZALES PROP LLC (reported 2013-09)

Resolved via: schedulingMARSHALL & WINSTON INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2015-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#42490 A MARSHALL & WINSTON, INC.
received 1979-02-13

Well Details

Well Number
2
Max Depth
7,500 ft
Drill Type
Vertical
County
GONZALES
District
1
Completed
1979-03-31

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
4,906,076 bbl
Cum Gas (all leases)
36,739,929 mcf
Total Permits
359

External Links

Live © 2026 Petrora