42-177-30565
Final CompletionHENDERSON-JOHNSTON
GONZALES County · District 1 · MOSBACHER PRODUCTION CO. · PEACH CREEK (BUDA)
Permits
2
Max Depth
8,700 ft
First Permit
1980-04-29
Latest Activity
1980-11-18
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-06-12
Shut-In
—
Plugged
1983-06-16
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (3)
| Interval | Type |
|---|---|
| 7,817–8,109 ft | Perforated |
| 7,817–8,400 ft | Perforated |
| 8,319–8,445 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 2,850 ft | 1,010 sx |
| 2.875" | 7,750 ft | — |
| 2.875" | 8,243 ft | — |
| 5.5" | 8,400 ft | 300 sx |
Permit History (2)
Applications (2)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 8,700 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- MOSBACHER PRODUCTION CO.
- Completed
- 1980-06-12
Operator
- Name
- MOSBACHER PROD CO
- Location
- HOUSTON
- P-5 Status
- Inactive (filed 1986-06-24)
- Total Permits
- 142