42-177-31356
Final CompletionJONES
GONZALES County · District 1 · LOMA ALTA PETROLEUM INC. · PEACH CREEK (AUSTIN CHALK)
Permits
1
Max Depth
7,100 ft
First Permit
1982-10-22
Latest Activity
1982-10-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-01-19
Shut-In
—
Plugged
1990-07-21
EWA / Permit operator mismatch
Scheduling: LOMA ALTA PETROLEUM INC. ≠ Permit: CALIX CORPORATION
Resolved via: scheduling → LOMA ALTA PETROLEUM INC.
Operator History
originally filed by CALIX CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 322 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| AUSTIN CHALK | 6,610 ft | -6,288 ft |
| EAGLEFORD (Eagle Ford) | 7,010 ft | -6,688 ft |
| BUDA | 7,040 ft | -6,718 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 6,620–6,733 ft | Perforated |
| 6,817–6,836 ft | Perforated |
| 6,854–7,004 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 9.625" | 1,686 ft | 725 sx |
| 2.375" | 6,834 ft | — |
| 5.5" | 7,011 ft | 350 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 7,100 ft
- Drill Type
- Vertical
- County
- GONZALES
- District
- 1
- Operator
- LOMA ALTA PETROLEUM INC.
- Completed
- 1983-01-19
Operator
- Name
- LOMA ALTA PETRO INC
- Location
- SAN ANTONIO
- P-5 Status
- Inactive (filed 1991-06-12)
- Total Permits
- 2