42-179-31925

Final Completion

ANDERSON CLARENCE A

GRAY County · District 10 · MAKAR PRODUCTION COMPANY · PANHANDLE GRAY COUNTY FIELD

Permits

1

Max Depth

3,550 ft

First Permit

1988-04-14

Latest Activity

1988-04-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-05-26

Shut-In

Plugged

1992-09-04

!

EWA / Permit operator mismatch

Scheduling: MAKAR PRODUCTION COMPANY ≠ Permit: SHAR-ALAN OIL COMPANY

Resolved via: schedulingMAKAR PRODUCTION COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 3,293 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
GRANITE WASH 3,092 ft+201 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
3,092–3,240 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"590 ft230 sx
4.5"3,299 ft220 sx

Permit History (1)

Applications (1)

#345190 A SHAR-ALAN OIL COMPANY
received 1988-04-14

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1988-05-26 log on file
W-2/G-1 1988-07-09

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GRAY County.

Well Details

Well Number
3
Max Depth
3,550 ft
Drill Type
Vertical
County
GRAY
District
10
Completed
1988-05-26

Operator

Location
GRAHAM
P-5 Status
X (filed 2026-04-29)
Cum Oil (all leases)
58,990 bbl
Cum Gas (all leases)
7,484,827 mcf
Activities
OPRS/G, OPRS/O
Total Permits
1