Permits
3
Max Depth
6,190 ft
First Permit
1977-11-09
Latest Activity
1988-07-19
Lifespan
11 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
2,000 bbl/d
Max Pressure
2,625 psi
Injection Interval
5,250–6,100 ft
Injected (12mo)
—
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 643 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| -S- SAND | 5,217 ft | -4,574 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 5,284–5,312 ft | Perforated |
| 5,676–5,680 ft | Perforated |
| 5,836–5,844 ft | Perforated |
| 5,947–6,112 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 13.375" | 400 ft | 450 sx |
| 8.625" | 3,540 ft | 1,550 sx |
| 5.5" | 6,189 ft | 860 sx |
Permit History (3)
Applications (3)
Records & Logs
3 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 450
- Max Depth
- 6,190 ft
- Drill Type
- Vertical
- County
- GRAYSON
- District
- 9
- Operator
- SHELL WESTERN E&P INC.
Operator
- Location
- HOUSTON
- P-5 Status
- Inactive (filed 1999-09-16)
- Cum Oil (all leases)
- 103,539,803 bbl
- Cum Gas (all leases)
- 1,149,777,929 mcf
- Total Permits
- 2,528