42-183-30070

Final Completion

WSCGU (ROBERTSON)

GREGG County · District 6 · XTO ENERGY INC.

Permits

2

Max Depth

8,900 ft

First Permit

2011-08-02

Latest Activity

2014-09-24

Lifespan

3 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2018-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (5) Elevation 281 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
RODESSA 6,433 ft-6,152 ft
JAMES (James Lime)6,894 ft-6,613 ft
PINE ISLAND7,010 ft-6,729 ft
PETTIT 7,119 ft-6,838 ft
TRAVIS PEAK 7,318 ft-7,037 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
7,254–7,296 ftPerforated
7,331–8,729 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"1,182 ft600 sx
8.625"1,182 ft1,150 sx
4.5"8,900 ft950 sx

Permit History (2)

Applications (2)

#795722 A XTO ENERGY INC.
received 2014-09-05
#720967 A XTO ENERGY INC.
received 2011-07-26

Records & Logs

2 completion filings on record.

W-2/G-1 2014-09-26
W-2/G-1 1973-04-02

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GREGG County.

Well Details

Well Number
104
Max Depth
8,900 ft
Drill Type
Vertical
County
GREGG
District
6

Operator

Location
SPRING
P-5 Status
X (filed 2026-04-08)
Cum Oil (all leases)
772,419,164 bbl
Cum Gas (all leases)
11,039,899,986 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,138