42-185-30233
Final CompletionTUCKER T.H. UNIT
GRIMES County · District 3 · HIGH CHAPPARAL OIL COMPANY · CARLTON SPEED (WILCOX 11800)
Permits
4
Max Depth
21,000 ft
First Permit
1979-11-05
Latest Activity
2025-02-20
Lifespan
45 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-10-03
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: HIGH CHAPPARAL OIL COMPANY ≠ Production: GALLOWAY ENERGY CO. (reported 2025-11)
EWA / Permit operator mismatch
Scheduling: HIGH CHAPPARAL OIL COMPANY ≠ Permit: GALLOWAY ENERGY CO.
Resolved via: production → GALLOWAY ENERGY CO.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (4)
TUCKER, T.J. · 9,680 ft
2025-02-20
T. J. TUCKER UNIT · 20,158 ft
1992-09-09
Spud 1992-09-09
TUCKER, T. H. · 20,158 ft
1985-07-18
TUCKER, T. H. UNIT · 21,000 ft
1979-11-05
Spud 1980-03-27
Permit Applications (4)
Well Details
- Well Number
- 1
- Max Depth
- 21,000 ft
- Drill Type
- Vertical
- County
- GRIMES
- District
- 3
- Operator
- HIGH CHAPPARAL OIL COMPANY
- Completed
- 1985-10-03
Operator
- Location
- PLNTERSVILL
- P-5 Status
- Y (filed 2002-02-01)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- 309,278 mcf
- Total Permits
- 41