42-185-30515

Horizontal

HOLTH

GRIMES County · District 3 · PRIDE ENERGY COMPANY · IOLA (GEORGETOWN)

Permits

5

Max Depth

9,935 ft

First Permit

1995-04-18

Latest Activity

2011-02-04

Lifespan

16 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-06-02

Shut-In

—

Plugged

—

Production Summary

Cum Oil

— bbl

Cum Gas

— mcf

First Production

1995-06

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4) Elevation 342 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
AUSTIN CHALK 8,565 ft-8,223 ft
SUB-CLARKSVILLE 8,920 ft-8,578 ft
WOODBINE 8,965 ft-8,623 ft
BUDA LM (Buda)9,796 ft-9,454 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
✓ 42-185-30641 KNOTTS UNIT · PATTERSON PETROLEUM LP
3.4 mi
Wilcox 1,890'Austin Chalk 8,314'Austin Chalk 8,316'Austin Chalk 8,365'Buda 9,430'Buda 9,480'Georgetown 9,510'Del Rio 9,545'Georgetown 9,553'Sub-Clarksville —Cook Mountain —Woodbine — +2 more
✓ 42-313-31325 RAIDER (ALLOCATION) · MD AMERICA ENERGY, LLC
4.2 mi
Sub-Clarksville 8,636'Eagle Ford 8,665'Woodbine 8,690'LEWISVILLE - DISPOSAL —Wilcox —DEX-BUDA —Buda —Georgetown —Rodessa —Frio —
✓ 42-313-31361 DEBORAH CAMP (ALLOCATION) · MD AMERICA ENERGY, LLC
4.9 mi
Sub-Clarksville 8,478'Woodbine 8,569'Eagle Ford 9,127'Wilcox —Rodessa —Frio —LEWISVILLE - DISPOSAL —Georgetown —DEX-BUDA —Buda —
✓ 42-313-30874 CAMP · PMO
4.9 mi
Austin Chalk 8,129'ASH MARKER 8,437'Sub-Clarksville 8,490'Woodbine 8,561'
✓ 42-313-31354 NED KELLEY (ALLOCATION) · MD AMERICA ENERGY, LLC
5.0 mi
Sub-Clarksville 8,485'Woodbine 8,577'Eagle Ford 9,131'LEWISVILLE - DISPOSAL —Wilcox —Rodessa —Frio —Georgetown —DEX-BUDA —Buda —
✓ 42-313-31126 COUNTY LINE · WOODBINE ACQUISITION LLC
5.1 mi
Austin Chalk 8,015'Austin Chalk 8,370'Woodbine 8,463'TOP WINDOW 8,476'RED MKR 8,487'BASE WINDOW 8,498'Wilcox —Frio —Sub-Clarksville —Georgetown —DEX-BUDA —LEWISVILLE - DISPOSAL — +2 more
✓ 42-313-31352 RAINIER (ALLOCATION) · MD AMERICA ENERGY, LLC
5.3 mi
Sub-Clarksville 8,361'Woodbine 8,463'Eagle Ford 8,957'LEWISVILLE - DISPOSAL —DEX-BUDA —Rodessa —Wilcox —Buda —Georgetown —Frio —
✓ 42-313-31254 CAROLINA · MD AMERICA ENERGY, LLC
5.4 mi
Sub-Clarksville 8,469'Woodbine 8,559'Eagle Ford 9,063'Eagle Ford 9,610'Rodessa —Frio —LEWISVILLE - DISPOSAL —Georgetown —DEX-BUDA —Buda —Wilcox —

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (2)

IntervalType
9,513–13,240 ftPerforated
9,861–13,977 ftPerforated

Casing (3)

SizeSet DepthCement
10.75"2,420 ft1,075 sx
7"9,861 ft735 sx
4.5"10,358 ft200 sx

Permit History (5)

Applications (5)

#708432 A PRIDE ENERGY COMPANY
received 2018-07-09
#708432 A PRIDE ENERGY COMPANY
received 2011-03-31
#708432 A PRIDE ENERGY COMPANY
received 2011-01-12
#434972 A CHESAPEAKE OPERATING, INC.
received 1995-05-16
#434972 A CHESAPEAKE OPERATING, INC.
received 1995-04-18

Records & Logs

5 completion filings on record · 2 with log images at RRC.

W-2/G-1 2020-01-23 log on file
W-2/G-1 2003-07-28
W-2/G-1 2003-08-05
W-2/G-1 1995-07-14 log on file
W-2/G-1 1996-05-20

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 30.796764
Lon -96.092930

Well Details

Well Number
1H
Max Depth
9,935 ft
Drill Type
Horizontal
County
GRIMES
District
3
Completed
1995-06-02

Operator

Location
TULSA
P-5 Status
Active (filed 2025-09-08)
Cum Oil (all leases)
2,574,338 bbl
Cum Gas (all leases)
4,227,488 mcf
Activities
OPRS/G, OPRS/O
Total Permits
55